{"id":1128,"date":"2021-01-05T16:48:36","date_gmt":"2021-01-05T16:48:36","guid":{"rendered":"https:\/\/staging.ptsansan.co.id\/cmt-vs-full-order-how-are-they-different\/"},"modified":"2026-07-27T11:22:32","modified_gmt":"2026-07-27T11:22:32","slug":"cmt-vs-full-order-how-are-they-different","status":"publish","type":"post","link":"https:\/\/staging.ptsansan.co.id\/id\/cmt-vs-full-order-how-are-they-different\/","title":{"rendered":"CMT VS Full Order, How Are They Different?"},"content":{"rendered":"<p><b><span style=\"font-weight: 400;\"><strong><a href=\"https:\/\/staging.ptsansan.co.id\/id\/\">PTSansan.co.id<\/a>\u00a0<\/strong><\/span><\/b><span style=\"font-weight: 400;\">&#8211; <\/span><span style=\"font-weight: 400;\">In the previous article, we have explained what CMT or what\u2019s known as makloon in Indonesian is. Well, in the present writing, we will explain even further the differences between CMT vs. full order systems, especially those found at PT. Sansan Saudaratex Jaya Textile Division. We certainly provide both services, so the decision will be yours to make. Keep in mind, there are several factors that differentiate CMT from full order. Here, we have outlined all the differences.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3539 size-medium aligncenter\" src=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-1-1536x1024-1.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-1-1536x1024-1.jpg 300w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-1-1536x1024-1.jpg 1024w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-1-1536x1024-1.jpg 768w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-1-1536x1024-1.jpg 1536w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-1.jpg 1620w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Material Purchase<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The first difference you can see between CMT vs. full order lies in the supply or purchase of the main materials. If you choose CMT, the fabric that will be used is deliberately selected and provided by the consumer himself. This is quite different from the full order system, where the vendor provides the materials for you as the consumer. CMT, in this case, may benefit you more if you are looking for quality fabrics that are quite unique and rare on the market.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Material Delivery<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Next, if you choose the CMT system, after you\u2019ve purchased and obtained the fabric of your choice, you must send it to the vendor yourself. For those of you who don&#8217;t want to bear this sort of impracticality, you would definitely prefer a full order system to cut unnecessary operations needed for shipping. However, by thoroughly knowing this process, you can continuously monitor the fabric that will be used and manufactured to ensure that no mistake or error is made on any of the parties involved.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Accessories Purchase<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In the CMT system, consumers usually hunt for additional clothing accessories themselves, such as embroidery or buttons. Nevertheless, this does not rule out the possibility that the vendor may offer this particular service as well. This is where it differs from the full order system, where additional accessories will be provided by the vendors according to consumer\u2019s need and demand. By purchasing the accessories yourself, you as a consumer can reduce production cost, especially if you are quite good at bargaining price.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Design Making<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3540 size-medium aligncenter\" src=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-2.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-2.jpg 300w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-2.jpg 1024w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-2.jpg 768w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-2.jpg 1536w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-2.jpg 1620w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">For this particular step, either through CMT or full order, you as a consumer will\u00a0 have to prepare and make clothing designs tailored to your needs. Certainly, it would be a good idea to have already prepared a design before choosing which manufacturing system to choose. Remember, you must discuss it with all parties involved, especially your staff. The vendor may provide design references, but the decision is all yours. Take a peek at some of the tips on choosing the best design for your office uniform <\/span><a href=\"https:\/\/staging.ptsansan.co.id\/id\/2020\/11\/10\/planning-to-design-corporate-uniforms\/\"><span style=\"font-weight: 400;\">in our previous article.<\/span><\/a><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Stitch Pattern Making<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In the next step, after the design is received and the material is made available, the vendor will then make a stitch pattern, otherwise known as the \u2018Cut\u2019 process in the CMT system. We have given a quite elaborate explanation on this topic in our previous article regarding CMT, which includes cutting, sewing and packaging.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Cutting, Sewing and Packaging<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-3541 size-medium aligncenter\" src=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-3-300x200-1.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-3-300x200-1.jpg 300w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-3.jpg 1024w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-3.jpg 768w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-3.jpg 1536w, https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/PT.-Sansan-Sistem-Order-Makloon-VS-Full-Order-Apa-Bedanya-3.jpg 1619w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">As you enter this particular step, it can be said that both services are neutral, meaning that there is no significant difference between the CMT vs. full order system. The cutting, sewing and packaging services will be entirely performed by the vendor. This is the reason why it is important for you to choose a reputable and trustworthy vendor because to actualize your dream design, you will have to depend on the vendor&#8217;s credibility and production capacity.<\/span><\/p>\n<ul>\n<li aria-level=\"1\">\n<h3><b>Conclusion<\/b><\/h3>\n<\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In conclusion, the difference between the CMT and full order system simply lies in how the first steps are performed, including material purchase and delivery until it\u2019s received by the vendor. We highly recommend the CMT system for those of you who intend to start a business which is specialized in unique shirts with distinctive materials. Should you want to reduce production costs and monitor material quality yourself, we also recommend choosing a CMT system. But, if you feel like being practical is a better option for you, then choose the full order system.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-3542 aligncenter\" src=\"https:\/\/staging.ptsansan.co.id\/wp-content\/uploads\/2026\/07\/02-Sansan.jpg\" alt=\"\" width=\"250\" height=\"167\" \/><\/p>\n<p><span style=\"font-weight: 400;\">No need to worry, whichever manufacturing service you choose, PT. Sansan Saudaratex Jaya Textile Division is here to answer your demands on reliable garment quality at very competitive prices. We offer services for all of the processes in our factory, from sizing, weaving, reactive dyeing, continuous vat dyeing, to pigment dyeing. Our production capacity reaches 3,000,000 meters \/ month to meet up with your fast demands. Feel free to consult your needs with us <\/span><a href=\"https:\/\/staging.ptsansan.co.id\/id\/job-order-textile\/\"><span style=\"font-weight: 400;\">via the following link.<\/span><\/a><span style=\"font-weight: 400;\"> We look forward to further endeavors with you.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b>Reference :<\/b> <a href=\"https:\/\/www.instagram.com\/tangankanan.bdg\/\"><span style=\"font-weight: 400;\">Tangan Kangan<\/span><\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>PTSansan.co.id\u00a0&#8211; In the previous article, we have explained what CMT or what\u2019s known as makloon in Indonesian is. Well, in the present writing, we will explain even further the differences between CMT vs. full order systems, especially those found at PT. Sansan Saudaratex Jaya Textile Division<\/p>","protected":false},"author":1,"featured_media":1127,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"sn_id_title":"","sn_id_content":"","sn_id_excerpt":"","sn_meta_desc":"","footnotes":""},"categories":[14],"tags":[],"class_list":["post-1128","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article"],"_links":{"self":[{"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/posts\/1128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/comments?post=1128"}],"version-history":[{"count":1,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/posts\/1128\/revisions"}],"predecessor-version":[{"id":1484,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/posts\/1128\/revisions\/1484"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/media\/1127"}],"wp:attachment":[{"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/media?parent=1128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/categories?post=1128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging.ptsansan.co.id\/id\/wp-json\/wp\/v2\/tags?post=1128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}